JOB-SITE MATH, NO SIGN-UP

MixTicket

Enter your dimensions, get yardage, bag count, and gravel tonnage — figured the way a batch plant would write it up.

Slab or footing

Rectangular pour — patio, sidewalk, strip footing.

ft
ft
in
10%
$

Slab / Footing

Order this much
0.00yd³
Volume0 ft³
60 lb bags (0.45 ft³ ea)0
80 lb bags (0.60 ft³ ea)0

Bag counts assume pre-mixed concrete (like a standard 60/80 lb bag). For anything over about 1 yard, ready-mix delivery is usually cheaper than bagged.

AD SLOT — 300×250 (insert AdSense unit here)